Since closing in 1962, it has lain vast and empty, stripped to its beams like the skeleton of a beached whale. When the expected hordes of passengers failed to materialise, the station continued but the waiting room was converted into a billiards hall, which ran for 40 years. The once-grand first-class waiting room is at Peckham Rye station, which was built in the 1860s as a London junction for visitors travelling from the south coast to the recently relocated Crystal Palace. Most people who have used that station every day don’t know it exists, which is an incredible thing in a city like London, where every square foot usually has purpose, because there’s that need for a growing population.” You also have this real sense of anticipation there, because a waiting room is always about something about to happen, about to arrive. “You’re actually sandwiched between the trains, so it’s like time has passed outside the windows, but it has been sort of preserved inside. “What I love about it is this idea of a negative space that’s been sitting in plain sight for so long,” she says. Subsequently, we supply these products to our customers.S arah Sze is a specialist in dissonant realities, so the discovery of an abandoned railway waiting room, silently hunkered down between tracks whooshing with trains, posed an irresistible challenge. Within our multidisciplinary project teams we specify, design, develop and qualify modules and products for our customers. The Technology & Development department consists of a number of competence groups, such as Mechanics, Mechatronics, Electronics, Software, Flow & Thermal and Project management. The high-tech production facility is equipped with state-of-the- art machinery to produce any designed product. Within VDL ETG, the department of Technology & Development (T&D) is responsible for the specification, design and integration of high tech mechatronic machine modules, professional systems and capital intensive equipment. ![]()
0 Comments
Leave a Reply. |